We acknowledge Australia’s Aboriginal and Torres Strait Islander peoples as the Traditional Custodians of the land on which we work and live and give respect to their Elders, past and present.

Read our Statement of Reflection

Your Cart

Your cart is empty right now...

Discover what's on
Your Stuff
Lists
No lists found
Create list
List name
0 Saved items
Updated: a few seconds ago
Getting Started
Get started with Your Stuff

A free Your Stuff account allows you to save, list and share your favourite collection items and articles. This account will give you access to Your Stuff, NFSA Player and Pro. You will need to create an additional account for Canberra event tickets.

Confirm
Skip to main content
National Film and Sound Archive of AustraliaNational Film and Sound Archive
National Film and Sound Archive of Australia
National Film and Sound Archive
National Film and Sound Archive of Australia
National Film and Sound Archive

Warringah Expressway: The finishing touches

1969

Warringah Expressway: The finishing touches

1969

    With all five overpasses opened to traffic and most of the roadwork laid, the final touches are added to the expressway including the installation of overhead lighting; the laying of asphalt paving and reflectors and domes to delineate lanes; the erection of fixed and movable traffic signs on the approaches and main sections of the expressway; the issuing of traffic maps and the landscaping of side areas.

    Courtesy of
    Presented by the New South Wales Department of Main Roads

    With all five overpasses opened to traffic and most of the roadwork laid, the final touches are added to the expressway including the installation of overhead lighting; the laying of asphalt paving and reflectors and domes to delineate lanes; the erection of fixed and movable traffic signs on the approaches and main sections of the expressway; the issuing of traffic maps and the landscaping of side areas.

    Courtesy of
    Presented by the New South Wales Department of Main Roads
    • Production company
      Kingcroft Productions
      Producer
      John Kingsford Smith
      Narrator
      Scott Newman
    • The first section of the Warringah Expressway was opened to traffic on 18 June 1968 by the then Governor of New South Wales, Sir Roden Cutler.

      Title Synopsis

      A public relations film made for the New South Wales Department of Main Roads (DMR) by Kingcroft Productions which documents the planning, construction and completion of the first stage of the Warringah Expressway from the northern approach of the Sydney Harbour Bridge to Cammeray – a total length of 2.4 kilometres.

      Footage includes the acquisition and demolition of private residences and commercial properties, existing concrete viaducts and a steel-arched tramway bridge to make way for the expressway; the excavation of rock; the installation of a drainage system of concrete pipes to dispose of stormwater collected on the roadways; the re-routing of traffic through detours; the building of five overbridges; the relocation of toll barriers at the northern end of the Sydney Harbour Bridge; the installation of lights and erection of signs; the construction of walkways and landscaping of the surrounding environment.

      Title Curator's Notes

      Some of the most remarkable footage in the film is of the deconstruction of a steel-arched tramway bridge as traffic travels unaffected beneath. The Warringah Expressway was designed to improve traffic flow out of Sydney to the northern suburbs. After clearing areas in the expressway’s path, the first section was built while traffic flowed through the construction area, requiring traffic to negotiate a series of detours around the site.

      The film contains long montages of construction works, accompanied by only a wistful score. The light music makes the accompanying images of large-scale work seem more effortless than they would have been. The occasional narration is written with the general public in mind. The film aims to reassure road users that any inconvenience during construction would be outweighed by the finished road’s easing of traffic congestion. The narration details progress of the project by highlighting construction milestones such as all five bridges being open to traffic by the end of 1967.

      This documentary is one of several sponsored films made by Kingcroft Productions for the NSW Department of Main Roads from 1967 to the mid-1970s.

      Notes by Poppy De Souza

    Industry professional? Go Pro

    Need to license this item? A/V professionals and researchers can shortlist licensing enquiries via our NFSA Pro catalogue search and membership.

    Get started with PRO

    Collections to explore

    • 1960s

    • Sydney

    • Roads, rails and runways

    • Start your own collection

      A free Your Stuff account allows you to save, organise and share your favourite videos, audio and stories.

    More in Stories+

    Personalized your experience

    Save, create and share

    With NFSA Your Stuff